11-16-2017, 10:06 AM
|
spirit of 72
|
|
Join Date: Aug 2006
Location: Plano, TX
Posts: 289
|
|
Quote:
Originally Posted by neil_w
Curious: what is their exact procedure for gluing on the pods? Glue the pylon to the BT first, then glue on the pod? Or pod to pylon, then assembly to BT?
I haven't yet figured out the "optimum" way of doing this. On a recent build I mounted thin strips of wood to the pods, then glued those strips to the pylons after the latter were installed.
|
According to the instructions, wings to airframe then pods to wing tips. http://plans.rocketshoppe.com/estes/est0895/est0895.pdf
|