Here's an interesting report from 1971 entitled "Study of an Evolutionary Interim Earth Orbit Program". It's basically calling for four more Skylabs, each one built successively after the others, designed for 1 year missions, and launched every 2 1/2 years, so that lessons learned from each station can be incorporated into the design of the next. The stations were to be serviced and resupplied by Apollo CSMs, possibly uprated to the four-man variant. The launch vehicle for the stations would have been the INT-21 variants of the final four Saturn V's, which were to be freed up by cancelling the lunar missions after Apollo 15. The crews and resupply craft would have been launched by either (uprated) Saturn IB's, Titan III-M with a hammerhead adapter section for the CSM (though this vehicle had insufficient performance to carry additional supplies and thus was eliminated) or a new Saturn IB variant using a three-motor cluster of Titan III-M SRMs for it's first stage with an S-IVB from Saturn IB for the second stage. The stations themselves would have been constructed similar to Skylab, using the S-IVB stages in the 'dry workshop' configuration, launched atop the two-stage Saturn V (using the S-IC and S-II stages similar to Skylab). The SRM/S-IVB launcher was shown to be cheapest and have the greatest lift capacity of any of the logistics/crew launchers examined.
The whole purpose of this proposal was to keep NASA "occupied" during the long gap between the final Skylab flight and the first shuttle flights leading up to the space station (which at the time was supposed to go hand-in-hand with the space shuttle) though no mention was made of the ASTP flights at the time (probably before the idea was even floated... )
At any rate, it's an interesting "might have been"... the last of the missions would have overlapped shuttle (well, by the preliminary timelines anyway-- since shuttle was delayed probably not had this proposal actually been done). Also ramps up the reality of a 3 SRM clustered first stage replacement for Saturn IB... by this time the 156 and 260 inch SRMs must've been well and truly dead, for no mention of them whatsoever was made.
Enjoy! OL JR
The whole purpose of this proposal was to keep NASA "occupied" during the long gap between the final Skylab flight and the first shuttle flights leading up to the space station (which at the time was supposed to go hand-in-hand with the space shuttle) though no mention was made of the ASTP flights at the time (probably before the idea was even floated... )
At any rate, it's an interesting "might have been"... the last of the missions would have overlapped shuttle (well, by the preliminary timelines anyway-- since shuttle was delayed probably not had this proposal actually been done). Also ramps up the reality of a 3 SRM clustered first stage replacement for Saturn IB... by this time the 156 and 260 inch SRMs must've been well and truly dead, for no mention of them whatsoever was made.
Enjoy! OL JR

Comment